top of page

East High School Band Hall

The new band hall replaces the existing facility. The 16,800 gsf design provides a main band hall and two smaller halls—one for each of the school’s bands. In addition to the halls, individual practice spaces and student services are provided. Long steel arches span the length of the building and provide an aesthetic appearance. The project is on-time and on-budget.

OWNER

Weslaco ISD

BUDGET

$4,600,000

LOCATION

Weslaco, TX

SQ. FT.

16,800

bottom of page